Why do we need specialized mounting brackets?
- Risk-resistant foundation: to cope with extreme weather (typhoon, snow) and geological changes (settlement, vibration) to avoid the fence tipping over.
- Flexible Adaptation: Match different terrains (mountain, desert, roof) and fence types (metal mesh, grill, electronic fence).
- Cost reduction and efficiency: standardized brackets reduce customization costs, modular design improves installation speed.
The four main design elements of solar fence mounting brackets
1. Material selection
- Galvanized steel: high bearing capacity, suitable for large ground power station, need to pay attention to the welding point anti-corrosion treatment.
- Aluminum alloy: light weight, corrosion resistance, suitable for roof or corrosive environment (coastal, near chemical plants).
- Composite material: good insulation, suitable for matching with electronic fence, but the cost is higher.
2. Type of structure
- Ground pile type: Helical ground pile is screwed directly into the ground without concrete, suitable for loose soil.
- Pre-embedded base: Fixed by concrete pouring, strong stability, used in rocky or high wind pressure area.
- Counterweight type: Fixed by concrete block or steel frame ballast, protect the waterproof layer of the roof, suitable for distributed power stations.
3. Connection technology
- Anti-loosening bolts: avoid vibration causing screws to fall off.
- Snap fastening structure: Reduce the reliance on tools and improve the installation efficiency.
- Elastic cushion: to alleviate the damage to the structure caused by thermal expansion and contraction or external impact.
4. Compatibility design
- The reserved holes are suitable for different fence post sizes;
- Adjustable height (±15cm) to cope with uneven ground.
Key steps for installation
- Pre-survey:
Testing soil hardness, underground pipelines (to avoid piling damage)
- Accurate positioning:
Use laser level to mark the bracket points, horizontal error ≤3mm, row/column spacing deviation <5cm.
- Anti-corrosion treatment:
Welding coated with antirust paint, coastal areas are recommended to use hot dip galvanized material.
- Dynamic monitoring:
Apply 50kg horizontal thrust to test the stability after installation, and check whether the ground stake is loose periodically.