News横幅
News
  • Jul 10, 2026 SolarPower Europe Report: Global New PV Capacity Hits Record 664 GW in 2025
    SolarPower Europe has released its Global PV Market Outlook 2026–2030. In 2025, newly installed solar capacity worldwide reached an all-time high of 664 GW. China led the global market with 382 GW, accounting for 57% of global additions, while India moved up to the world’s second-largest...
    view details
  • Jul 03, 2026 POW-TRB-D09 Asphalt Shingle Roof PV Mounting System – Reference Case Studies
    Model POW-TRB-D09 is a dedicated pitched roof photovoltaic mounting solution engineered for asphalt composite shingle rooftops, widely deployed across residential & light commercial distributed PV projects throughout Europe.   Fabricated from aerospace-grade aluminium alloy A6005-T5 +SUS 30...
    view details
  • Jun 16, 2026 Holiday Notice: Dragon Boat Festival Closure
    To all valued clients and partners,   This notice serves to inform you of the upcoming office closure for the traditional Chinese Dragon Boat Festival. POWERACK will be officially closed for the festival holiday from Friday, June 19 to Sunday, June 21, 2025. Normal business operations will full...
    view details
  • Jun 04, 2026 Powerack Ground-Mount System Success Stories
    Case sharing from customers Powerack ground-mount systems, Not only is it easy to install, but the effect after installation is also very good.                                            ...
    view details
  • May 29, 2026 Installation and Use of Solar PV Grating Walkway
    Solar PV grating walkways are modular access and maintenance pathways designed specifically for photovoltaic power stations—particularly rooftop distributed systems. Our range of walkways primarily comprises glass grating walkways, steel grating walkways and aluminium grating walkways.  ...
    view details
  • May 28, 2026 The bustling Live of Solar & Storage Live Philippines 2026
    The demand for solar mounting systems in the Philippines is booming. Over the two days of the exhibition, we have welcomed many existing and new customers, all of whom have been very impressed with our products. The Philippine market is thriving, and we are committed to providing even more professio...
    view details
  • May 09, 2026 SOLAR & STORAGE LIVE Philippines 2026 INVITATION
    We cordially invite you to visit our booth at“SOLAR & STORAGE LIVE Philippines 2026,” Southeast Asia’s premier event for renewable energy innovation.   This exhibition offers you an excellent opportunity to learn more about our latest solar and energy storage solutions des...
    view details
  • Apr 29, 2026 LABOR DAYHOLIDAY NOTICE
    Dear All,   Please be informed that our company will observe the Labor Day holiday as follows: The holiday period is from May 1st to May 5th.We will resume normal work on May 6th. During the vacation, daily business and services will be temporarily suspended. For urgent matters, please contact...
    view details
  • Apr 17, 2026 Germany Installs Over 1.4 GW of New Solar PV in March, Ground-Mounted Plants Lead Growth with More Than 50% Shar
    Latest figures released by the German Federal Network Agency (Bundesnetzagentur) show that Germany added 1.41 gigawatts (GW) of new solar photovoltaic (PV) capacity in March 2026, bringing total first-quarter installations to 3.28 GW. While the monthly deployment rate rebounded noticeably from the...
    view details
  • Apr 09, 2026 Powerack Easy-Install No-Drilling Solar Ballast-A Mounting System
    The Powerack ballast bracket kit is a customisable flat roof mounting system for PV modules. Standard tilt angles for ballasted solar racks are 10° and 15°. The front and rear leg structure is manufactured from high-strength AL6005‑T5 aluminium alloy. This is a fully aluminium solar mountin...
    view details
  • Mar 26, 2026 Powerack East-West Ballasted Mounting Design
    Powerack East-West Ballasted Mounting Design(Ballasted-A)- For Flat Rooftop! What makes this integrated system stand out is its simplicity and efficiency. It is designed to be easy to install and maintain, saving time and reducing labor costs. Plus, it has high reliability against harsh weather...
    view details
  • Mar 18, 2026 Orders placed before the Spring Festival are being continuously delivered
    Following the Spring Festival holiday,Our production and logistics operations have resumed normal work.All orders placed before the festival are being processed and delivered in an orderly manner. Customers can keep track of their order status at any time through our sales representatives. We are ma...
    view details
1 2 3 4 5 6 7 8 9 10 13 14

A total of 14 pages

Need Help? Chat with us

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit
see more

Our hours

Mon  -Fri : 9 AM - 8 PM
(all hours are Eastern Time)

Looking for International Support?

Home

products

whatsApp

contact